top of page

Prepare bids faster, boost your chances of winning, and cut costs.

18 hours ago
2 min read


Preparing a tender takes time, and that means missed opportunities. Qonnected helps you tender faster. Our free Q-Platform combines data from your BIM model with your tender documents, including the project description, to generate a material takeoff. You can organise it by STABU classification, subcontractor trade or construction phase.

Q-Tender turns your project data into ready-to-send tender packages. You can send them to the subcontractors you select, who can then request quotes from their own subcontractors through the same platform.


Subcontractors can use the Q-Product database to automatically identify the lowest-priced suppliers and put together their quotes. Q-Product also lets them order directly from manufacturers, potentially saving around 40% of the wholesaler’s margin. A substantial share of those savings can be passed on to you, the main contractor, through lower quotes.



The Q-Platform gives you automatic access to:

  • 200 contractors

  • 17,000 subcontractors

  • 1,750 manufacturers and suppliers

  • 984 transport providers

  • 50,000 trucks

  • 1.5 million m² of Q-Hub storage space

  • 100 waste management and demolition companies

  • 5,670,869 item numbers

  • 1,375,423 products

  • 1,236 brands


You can also open your tender to the entire subcontractor network. With everything in one free platform, you can prepare more tenders, compare quotes and send out tender packages in a fraction of the time, without paying for separate software. If you win the contract, you’ll already have everything in place to get started.


The Q-Platform also automatically generates a logistics plan tailored to your project, setting out how we would manage your construction logistics. This gives you the opportunity to cut logistics costs by up to 50%. In this example, logistics accounts for 15% of total development costs, so the potential saving is 7.5% of the total project cost.


There is also potential to save on materials. If materials account for 50% of total development costs and you achieve a 40% saving on those costs, that represents a further 20% of the project total. On a €100 million project, the two figures add up to €27.5 million in potential cost savings. This figure excludes any additional savings from reducing rework and errors, which can account for around 10% of construction costs.



Example project with €100 million in total development costs

Cost category

Calculation

Potential savings

Materials

40% assumed saving on €50 million in material costs

€20,000,000

Logistics

50% saving on €15 million in logistics costs, which account for 15% of total development costs

€7,500,000

Total potential savings


€27,500,000

You can also add a comprehensive circularity plan that covers efficient, sustainable construction waste management.


The Q-Platform and the plans are free. You only pay for transport and storage services, with the aim of keeping those costs below the savings you achieve. You can start using the Q-Platform at any point during tendering or construction, with no upfront investment. The sooner you start, the sooner you can begin saving.


 
 
 

Comments


bottom of page